Nuclear Means Stable
The year 2022 has once again demonstrated the significance of nuclear for the global energy mix. And while the focus was initially on the non-carbon nature of nuclear energy, over…
On 29 August 2016, Kudankulam Unit 2 built with technical assistance from ASE Group (Rosatom’s subsidiary) was connected to the Indian national power grid. The first fuel assembly was loaded into the core on 11 May 2016.